Ford Focus>> Engines>> Installation of the power unit>> Zetec-SE 1,4 engine installation — 1,6 l with a transmission
Installation of the power unit carry out in the following sequence:
- connect the contact socket of the sensor of speed of the car (VSS);
- connect the contact socket of the switch of light of a backing;
- lift the car so that under it it was possible to bring an assembly table with the power unit;
- carefully lower the car;
- establish lobbies and back support of the power unit;
- lift the car so that from under it it was possible to deduce an assembly table;
- attach a tube to the working cylinder of coupling;
- establish both semi-axes, thus do not turn CV JOINTS on big corners. A bracket of the intermediate bearing and a nut of fastening replace with the new.
Models with the conditioner
Collect an arm of the pump of the hydraulic booster of a steering together with a natyazhitel of a belt of a drive of auxiliary units.
All models
Connect a spherical support of both cross-section levers of a suspension bracket to a fist;
- connect cables of the mechanism of management of a transmission;
- connect contact sockets of the oxygen sensor and the sensor of an angle of rotation of a cranked shaft;
- connect the contact socket of the sensor of pressure of oil;
- establish a reception pipe with silfony, laying replace with the new;
- establish a starter.
Models without the conditioner
Establish the pump of the hydraulic booster of a steering together with a basic plate;
- connect the pipeline of the hydraulic booster of a steering.
Models with the conditioner
Establish the conditioner compressor;
- establish an arm of the pipeline of a high pressure of the hydraulic booster of a steering.
All models
Establish a belt of a drive of auxiliary units, pull it and put a cover;
- lower the car;
- establish hoses of system of cooling. Pay attention to collars, they should be established without distortions;
- connect the vacuum pipeline to the case with absorbent carbon.
Models without the conditioner
Connect wires to the generator;
- connect the contact socket of the hydraulic booster of a steering.
Models with the conditioner
Connect wires to the generator.
All models
Connect the remained pipelines and hoses;
- connect the central contact socket of a plait of wires of the engine and the sensor of an angle of rotation of a camshaft (SMR);
- connect cables of the mechanism of management of a transmission;
- establish a heat-shielding casing of a final collector and a wire of connection with "weight";
- connect fuel tubes;
- establish a cable of an accelerator and fix it;
- establish the air filter with a sleeve of a fence of air;
- connect the contact socket to the sensor of a mass consumption of air;
- attach a hose of ventilation of a case to a block head;
- establish a broad tank of system of cooling;
- fix on clips a tank of liquid of the hydraulic booster of a steering;
- tighten nuts of rods of the right and left shock-absorbers;
- establish an arm of the storage battery and the battery;
- pour in a broad tank cooling liquid;
- remove air from hydraulic system of coupling;
- check oil level in the engine;
- connect wires to plugs of the storage battery;
- start up the engine and warm up it. Check tightness of all connections and hoses;
- make a trial trip run not less than 20 km. During this time electronic control systems of the engine and the car should be activated. If you find failures in operation of the engine, for example unevenness of rotation of a cranked shaft of the engine idling, go on specialized station Ford where to you will reprogram the control unit anew;
- after a trial trip again check levels of working liquids, reliability of fixing connections and tightness of the shlangovy.